Lenox Road Complete Safe Street

Highlights

  • Major project to enhance pedestrian and cyclist safety
  • All three sections are currently in progress
  • Section I features an urban linear park dubbed Lenox Boardwalk
  • Section II will enhance pedestrian infrastructure and safety between Peachtree Rd. and Phipps Blvd.
  • Section III includes a first-of-its-kind elevated pedestrian and bicycle bridge at the GA 400 interchange

The Lenox Road Complete Safe Street fulfills the plans outlined in the Lenox Road Scoping Study within the 2017 BUCKHEAD REdeFINED plan. This project includes three sections, all of which are currently in progress.

Section I

The focus of Section I will be the Lenox Boardwalk, a new urban linear park that includes a 10’-12’ multiuse trail along Lenox Road between the Lenox MARTA Station (on East Paces Ferry Road) and Peachtree Road (SR 141). This wide boardwalk will enhance visual aesthetics of the area while creating a better connection between existing businesses.

Work is beginning in April 2024 and is anticipated to be complete in November 2025.

Section II

Section II will enhance pedestrian infrastructure and overall appearance starting at Peachtree Road and continuing to Phipps Boulevard. This section of roadway leads to some of Buckhead’s top-rated shopping centers and a major part of the commercial core. Improvements will focus on adding larger sidewalks, ramps, staircases and additional lighting.

Design is in progress and construction is expected to begin in 2025.

Early concept rendering of the Lenox Road bicycle-pedestrian bridge in Section III

Section III

Section III will address the section of Lenox Rd. between Phipps Blvd. and Piedmont Rd. To improve connectivity and pedestrian safety at the busy Lenox Rd./GA 400 Interchange, Section III will include an elevated pedestrian and bicycle bridge which will be the gateway to HUB404.

Design is in progress and construction is anticipated to begin in late 2025.

Lenox Mall Boardwalk
Lenox Boardwalk in Section I

Project Details

  • Partners: Georgia Dept. of Transportation, City of Atlanta, MARTA, Pond & Company and Kimley-Horne
  • Status: Active
  • Timeline: Section I construction beginning April 2024 and anticipated to be complete in November 2025; Section II and III design in progress and construction to begin in 2025
Pedestrian infrastructure improvements in Section II