Projects |

Restriping Project

Current status:

Restriping is in progress on West Paces Ferry Road. Work on East Paces Ferry and Pharr Roads is complete.

E. Paces/Bolling

Left turning cars to Bolling Way now have a dedicated left turn. EB through cars must merge to the right.

 

The Buckhead CID worked with traffic engineering consultants and the Department of Public Works to redesign how West Paces Ferry, East Paces Ferry and Pharr Roads carry traffic.

The West Paces Ferry Road redesign will restore most of the auto vehicle capacity, retain a bike lane on the south side and add a mid-block crossing between One Buckhead Plaza and Whole Foods.

The East Paces Ferry Road redesign will change the intersection at Bolling Way so that cars using Bolling Way to get to Peachtree Road northbound will turn left from a dedicated lane while cars continuing east will need to merge or stay in the right lane. This should alleviate last second weaving at the intersection and make it safer for pedestrians to cross East Paces Ferry Road.

The Pharr Road redesign will add a center left turn lane and bike lanes by converting two existing through lanes.